2062 - Rockville/Cape Fear spends on a new ballpark!
Posted: Thu Jan 16, 2025 1:12 am
If my calculations are correct, I have 226 PPT and some change at my disposal (my current balance + half of previous GM's PPT carried over).
I would like to use the Team Relocation reward to move the team.
I qualify for 3 of the 6 criteria (FI 60 or less, five consecutive losing seasons, and attendance less than 65% of stadium capacity in both the previous two seasons), which means I qualify for double the Ballpark Construction reward.
So we're building a new ballpark!
- - - -
Ballpark Name: Blackwater Field
Location: Wilmington, North Carolina
Capacity: 45,000
Stadium type: Open ballpark
Surface: Grass
Dimensions:
Left Line 324, 6 ft
Left Field 346, 6 ft
Left Center 385, 10 ft
Center Field 417, 14 ft
Right Center 385, 14 ft
Right Field 351, 14 ft
Right Line 328, 14 ft
Park factors:
AVG LHB .945
AVG RHB 1.080
Doubles .920
Triples .935
Home Runs LHB .955
Home Runs RHB 1.080
I'll throw in an additional 100 PPT to offset construction costs by $10M.
So, here's the accounting:
Base cost: 100 PPT + $50M cash
Upgrade capacity to 45,000: +$4M
PPT offset brings total cost to: 200 PPT + $44M
Bonus funds should cover most of the cost, so please take from there first, and then take any remaining amount from in-game. (thanks Jim for being loaded, lol)
Here's the article about the new ballpark: http://montybrewster.net/forums/viewtop ... 51&t=53123
I would like to use the Team Relocation reward to move the team.
I qualify for 3 of the 6 criteria (FI 60 or less, five consecutive losing seasons, and attendance less than 65% of stadium capacity in both the previous two seasons), which means I qualify for double the Ballpark Construction reward.
So we're building a new ballpark!
- - - -
Ballpark Name: Blackwater Field
Location: Wilmington, North Carolina
Capacity: 45,000
Stadium type: Open ballpark
Surface: Grass
Dimensions:
Left Line 324, 6 ft
Left Field 346, 6 ft
Left Center 385, 10 ft
Center Field 417, 14 ft
Right Center 385, 14 ft
Right Field 351, 14 ft
Right Line 328, 14 ft
Park factors:
AVG LHB .945
AVG RHB 1.080
Doubles .920
Triples .935
Home Runs LHB .955
Home Runs RHB 1.080
I'll throw in an additional 100 PPT to offset construction costs by $10M.
So, here's the accounting:
Base cost: 100 PPT + $50M cash
Upgrade capacity to 45,000: +$4M
PPT offset brings total cost to: 200 PPT + $44M
Bonus funds should cover most of the cost, so please take from there first, and then take any remaining amount from in-game. (thanks Jim for being loaded, lol)
Here's the article about the new ballpark: http://montybrewster.net/forums/viewtop ... 51&t=53123